WattmapUS data center projects Start free trial

Where data centers cannot be built right now

658 moratoriums, bans, zoning conditions and tax changes in force across 43 states. Updated Oct 22, 2026.

Measures in force658across 43 states
Tracked in total970including expired and lifted
Most affectedOhio63 in force
Kinds of measure9Moratorium · Zoning Overlay / Special Use Permit

A moratorium list is table stakes — several are published free. What is not published anywhere else is which tracked projects sit inside one of these measures, which is what the terminal shows on every project. Most measures here were compiled from an open inventory rather than read off the ordinance — how we source and check them.

43 states

Ohio 63

JurisdictionLevelWhat it doesWindow
AEP Ohio, OHdata center tariff: 85% minimum demand, 12-year terms, exit fees for loads over 25 MW Utility / Grid Large-Load / Interconnection Rule Since Jul 2025 · no end date
Alliance, OH548-day data center moratorium City / Town Moratorium Jul 2026 → Jan 2028
Archbold, OHdata center moratorium Township / Village Moratorium Since Apr 2026 · no end date
Avon, OHdata center moratorium City / Town Moratorium Apr 2026 → Apr 2027
Berea, OH1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Blanchester, OH731-day data center moratorium Township / Village Moratorium Mar 2026 → Mar 2028
Braceville Township, OH6-mo data center moratorium Township / Village Moratorium Jun 2026 → Nov 2026
Butler County, OH6-mo data center moratorium County / Parish Moratorium Jun 2026 → Dec 2026
Canton Township, OH1-yr data center moratorium Township / Village Moratorium Apr 2026 → Apr 2027
Cincinnati IDC Overlay #89data centers City / Town Zoning Overlay / Special Use Permit Feb 2026 → Feb 2027
Cincinnati, OHdata center moratorium City / Town Moratorium Feb 2026 → Feb 2027
City of Hubbard, OH1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
City of New Carlisle, OH1-yr data center moratorium City / Town Moratorium Feb 2026 → Feb 2027
City of Urbana, OHdata center moratorium and rezoning City / Town Moratorium Since Mar 2026 · no end date
Clearcreek Township, Warren County, OHyearlong data center moratorium Township / Village Moratorium No end date
Cleveland, OHCleveland Public Power large-load interconnection cost assignment City / Town Large-Load / Interconnection Rule No end date
Cleveland, OHdata center moratorium (extended through 2027-01-29) City / Town Moratorium Jul 2026 → Jan 2027
Columbus, OHOrdinance 2560-2026 large-user water and power rate study City / Town Siting / Noise / Water Restriction Since Sep 2026 · no end date
Commercial Point 18-month data center pause Township / Village Pause Since May 2026 · no end date
Cortland, OH1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Fayette Countyproposed one-year data center moratorium (eight of ten townships) County / Parish Moratorium Sep 2026 → Jun 2027
Findlay, OH1-yr data center moratorium City / Town Moratorium Apr 2026 → Apr 2027
Grafton, OH5-yr data center moratorium Township / Village Moratorium May 2026 → May 2031
Grove City, OHdata center moratorium City / Town Moratorium No end date
Hamilton Township, Warren County, OHyearlong data center moratorium Township / Village Moratorium No end date
Howland Township, OH6-mo data center moratorium Township / Village Moratorium Jun 2026 → Dec 2026
Jackson Township (Franklin County), OH1-yr data center moratorium Township / Village Moratorium May 2026 → May 2027
Kent, OH1-yr data center moratorium City / Town Moratorium Apr 2026 → Apr 2027
Lake Township, OH1-yr data center moratorium Township / Village Moratorium Mar 2026 → Mar 2027
Liberty Township, Knox Countyexplicit data center prohibition Township / Village Outright Ban Since Sep 2026 · no end date
Massillon, OHdata center zoning ordinance (Ord. 60-2026) City / Town Siting / Noise / Water Restriction Since Aug 2026 · no end date
Maumee, OH1-yr data center moratorium City / Town Moratorium Feb 2026 → Feb 2027
Miamisburg, OH9-month data center moratorium City / Town Moratorium Since Sep 2026 · no end date
Monclova Township, OH1-yr data center moratorium Township / Village Moratorium Feb 2026 → Feb 2027
Montgomery Township, OH2-yr data center moratorium Township / Village Moratorium Jun 2026 → Jun 2028
Muhlenberg Township, OH1-yr moratorium Township / Village Moratorium Feb 2026 → Feb 2027
Perry Village, OHone-year data center moratorium (Champion Farm exception) Township / Village Moratorium Since Oct 2026 · no end date
Pierce Township, OH240-day data center moratorium Township / Village Moratorium Feb 2026 → May 2027
Plain Township, OH1-yr data center moratorium Township / Village Moratorium Mar 2026 → Mar 2027
Providence Township, OH1-yr data center moratorium Township / Village Moratorium Apr 2026 → Apr 2027
Ravenna, OH1-yr data center moratorium City / Town Moratorium Apr 2026 → Apr 2027
Richfield Township, OH1-yr data center moratorium Township / Village Moratorium Feb 2026 → Feb 2027
Scioto Township, OH1-yr data center moratorium Township / Village Moratorium Mar 2026 → Mar 2027
Shalersville Township, OHdata center moratorium Township / Village Moratorium Nov 2026
Shawnee Township, OH540-day data center moratorium Township / Village Moratorium Apr 2026 → Oct 2027
Spencer Township, OH1-yr data center moratorium Township / Village Moratorium Mar 2026 → Mar 2027
Sprigg Township, OH1-yr data center moratorium Township / Village Moratorium Mar 2026 → Mar 2027
Springfield, OH6-mo data center moratorium City / Town Moratorium Jul 2026 → Jan 2027
St. Bernard, OH12-month data center moratorium Township / Village Moratorium Since Sep 2026 · no end date
St. Marys, OH1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Tallmadge, OH6-mo data center moratorium City / Town Moratorium Apr 2026 → Apr 2027
Tiffin, OH1-yr data center moratorium City / Town Moratorium Apr 2026 → Apr 2027
Vermilion, OHdata center moratorium City / Town Moratorium Mar 2026 → Mar 2027
Village of Ashville, OH6-mo data center moratorium Township / Village Moratorium Dec 2025 → Jan 2027
Village of Lordstown, OH6-mo data center moratorium Township / Village Moratorium Jan 2026 → Jan 2027
Village of McDonald, OH1-year data center moratorium Township / Village Moratorium Since Sep 2026 · no end date
Warren County, OHproposed data center moratorium County / Parish Moratorium Since Sep 2026 · no end date
Warren, OH1-yr data center moratorium City / Town Moratorium Since Sep 2026 · no end date
Waterville Township, OH1-yr data center moratorium Township / Village Moratorium Dec 2025 → Dec 2026
Wellington village data-center moratorium City / Town Moratorium Since Mar 2026 · no end date
Westlake, OH6-month data center moratorium City / Town Moratorium Since Sep 2026 · no end date
Williamsburg, OH1-yr data center moratorium Township / Village Moratorium Mar 2026 → Mar 2027
Yellow Springs, OH1-yr data center moratorium Township / Village Moratorium May 2026 → May 2027

Projects in Ohio →

Michigan 53

JurisdictionLevelWhat it doesWindow
Allendale Township, MI1-yr data center moratorium Township / Village Moratorium Jun 2026 → Jun 2027
Armada Township, MI6-mo data center moratorium Township / Village Moratorium Jan 2026 → Dec 2026
Big Rapids Charter Township, MI1-yr data center moratorium Township / Village Moratorium Feb 2026 → Feb 2027
Blair Township, MIdata center moratorium Township / Village Moratorium Since Oct 2026 · no end date
Bruce Township, MIdata center moratorium Township / Village Moratorium No end date
Chesaning Township, MI1-yr data center moratorium Township / Village Moratorium May 2026 → May 2027
City of Flint, MI1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
City of Saginaw, MIdata center special land use ordinance City / Town Zoning Overlay / Special Use Permit Since Oct 2026 · no end date
City of Ypsilanti, MIdata center zoning-permit moratorium City / Town Moratorium Since Mar 2026 · no end date
Clark Township, MIdata center and cryptocurrency mining special land use ordinance Township / Village Zoning Overlay / Special Use Permit Since Aug 2026 · no end date
Delta County, MI1-yr data center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
East Lansing, MIdata center moratorium extended to March 2027 City / Town Moratorium Aug 2026 → Mar 2027
Egelston Township, MI6-mo data center moratorium Township / Village Moratorium Since Oct 2026 · no end date
Filer Township, MI1-yr data center moratorium Township / Village Moratorium Jun 2026 → Jun 2027
Forsyth Township, MIdata center moratorium Township / Village Moratorium Since Jun 2026 · no end date
Frenchtown Township data center moratorium Township / Village Moratorium No end date
Grand Blanc Township, MI1-yr data center moratorium Township / Village Moratorium Jan 2026 → Jan 2027
Green Charter Township, MI1-yr data center moratorium Township / Village Moratorium Dec 2025 → Dec 2026
Hagar Township, MI1-yr data center moratorium Township / Village Moratorium Jul 2026 → Jul 2027
Hart, MI6-mo data center moratorium City / Town Moratorium May 2026 → Nov 2026
Houghton, MI1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027
Howell Township, MIdata center moratorium (extended to May 2027) Township / Village Moratorium Since Nov 2025 · no end date
Huron County, MI3-yr data center moratorium County / Parish Moratorium May 2026 → May 2029
Lake Township, MI6-mo data center moratorium Township / Village Moratorium Jul 2026 → Jan 2027
Lansing, MI6-mo data center moratorium City / Town Moratorium Jul 2026 → Jan 2027
Lincoln Township, MI300-day data center moratorium Township / Village Moratorium Jun 2026 → Apr 2027
Lyndon Township, MI1-yr data center moratorium Township / Village Moratorium May 2026 → May 2027
Lyon Charter Township (Oakland County), MI6-mo data center moratorium Township / Village Moratorium May 2026 → Oct 2026
Lyon Township, MI6-mo data center moratorium Township / Village Moratorium May 2026 → Oct 2026
Manchester Township, MIdata center moratorium Township / Village Moratorium Since Oct 2025 · no end date
Mason Township, MI1-yr data center moratorium Township / Village Moratorium May 2026 → May 2027
Meridian Township, MI6-mo data center moratorium Township / Village Moratorium May 2026 → Nov 2026
Orion Township, MI6-mo data center moratorium Township / Village Moratorium Jun 2026 → Dec 2026
Park Township, MIdata center moratorium Township / Village Moratorium Since May 2026 · no end date
Parma Township (Jackson County), MI1-yr data center moratorium Township / Village Moratorium Feb 2026 → Feb 2027
Pine Grove Township, MI6-mo data center moratorium Township / Village Moratorium Jun 2026 → Nov 2026
Pittsfield Township, MI6-mo data center moratorium Township / Village Moratorium Nov 2025 → Nov 2026
Porter Township, MI1-yr data center moratorium Township / Village Moratorium May 2026 → May 2027
Saginaw, MI6-mo data center moratorium City / Town Moratorium Jan 2026 → Dec 2026
Saline City, MI1-yr data center moratorium City / Town Moratorium Jan 2026 → Jan 2027
Saugatuck Township, MIdata center moratorium Township / Village Moratorium Since Feb 2026 · no end date
Sault Ste. Marie Tribe of Chippewa Indians, MIdata center moratorium Other Moratorium Since Apr 2026 · no end date
Sherman Township, MI1-yr data center moratorium Township / Village Moratorium Jun 2026 → Jun 2027
South Lyon, MI1-yr data center moratorium City / Town Moratorium No end date
Sterling Heights, MI1-yr data center moratorium City / Town Moratorium Feb 2026 → Feb 2027
Taylor, MI1-yr data center moratorium City / Town Moratorium Jan 2026 → Jan 2027
Texas Township, MI1-yr data center moratorium Township / Village Moratorium Jun 2026 → Jun 2027
Tyrone Township, MI6-mo data center moratorium Township / Village Moratorium Dec 2025 → Feb 2027
Village of Romeo, MI1-yr data center moratorium Township / Village Moratorium Jan 2026 → Jan 2027
Washington Township, MI6-mo data center moratorium Township / Village Moratorium May 2026 → Nov 2026
Watertown Township, MI1-yr data center moratorium Township / Village Moratorium May 2026 → May 2027
Ypsilanti Community Utilities Authority, MI1-yr data center moratorium Other Moratorium Apr 2026 → Apr 2027
Ypsilanti Township, MI6-month moratorium on new major electric infrastructure Township / Village Moratorium Since Aug 2026 · no end date

Projects in Michigan →

Georgia 43

JurisdictionLevelWhat it doesWindow
Adel (Cook County), GA6-mo data center moratorium City / Town Moratorium Jul 2026 → Jan 2027
Albany, GA1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027
Augusta-Richmond County data center ordinance County / Parish Zoning Overlay / Special Use Permit Since Sep 2026 · no end date
Brooks County, GA90-day data center moratorium County / Parish Moratorium Feb 2026 → Dec 2026
Bulloch County, GA90-day data center moratorium County / Parish Moratorium Feb 2026 → Dec 2026
Calhoun (Gordon County), GAdata center moratorium City / Town Moratorium Jan 2027
Camden County, GA6-mo data center moratorium County / Parish Moratorium May 2026 → Oct 2026
Carroll County, GA100-day data center moratorium County / Parish Moratorium Mar 2026 → Nov 2026
Chatham County, GAproposed data center moratorium County / Parish Moratorium Sep 2026 → Feb 2027
Cherokee County, GA30-day data center moratorium County / Parish Moratorium Jul 2026 → Feb 2027
Clayton County, GAdata center moratorium County / Parish Moratorium No end date
Cobb County, GA6-mo data center moratorium County / Parish Moratorium Feb 2026 → Feb 2027
Covington, GAdata center supplemental-use ordinance City / Town Siting / Noise / Water Restriction No end date
Decatur County, GAdata center moratorium County / Parish Moratorium Since Apr 2026 · no end date
DeKalb County, GA100-day data center moratorium County / Parish Moratorium Jun 2025 → Mar 2027
Dougherty County, GA45-day data center moratorium County / Parish Moratorium Jul 2026 → Feb 2027
Early County, GAdata center ordinance (1,000-ft buffer) County / Parish Siting / Noise / Water Restriction Since Jul 2026 · no end date
East Point (Fulton County), GA90-day data center moratorium City / Town Moratorium No end date
Garden City (Chatham County), GA6-mo data center moratorium City / Town Moratorium Jun 2026 → Dec 2026
Georgia Power Large-Load Contracting Rules and Review Process (Docket 44280) Utility / Grid Large-Load / Interconnection Rule Since Jan 2025 · no end date
Gordon County, GAdata center moratorium County / Parish Moratorium Jan 2027
Hall County, GA6-mo data center moratorium County / Parish Moratorium Feb 2026 → Feb 2027
Hall County, GAdata center development code (Article 7) County / Parish Zoning Overlay / Special Use Permit Since Sep 2026 · no end date
Hart County, GA6-mo data center moratorium County / Parish Moratorium May 2026 → Nov 2026
Hogansville, GAdata center application moratorium City / Town Moratorium Dec 2026
Kingsland (Camden County), GA1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
Lamar County, GAdata center moratorium County / Parish Moratorium Since Sep 2025 · no end date
Lee County, GAdata center moratorium County / Parish Moratorium Dec 2026
Liberty County, GA120-day data center moratorium County / Parish Moratorium Since Oct 2026 · no end date
Lovejoy, GAdata center construction ban City / Town Outright Ban Since Sep 2026 · no end date
Marietta, GAdata center moratorium City / Town Moratorium Jul 2026 → Dec 2026
Milton (Fulton County), GA6-mo data center moratorium City / Town Moratorium Jun 2026 → Dec 2026
Newton County, GAlimited data center application moratorium County / Parish Moratorium Apr 2026 → Dec 2026
Paulding County, GAdata center moratorium County / Parish Moratorium Jul 2026 → Jan 2027
Pembroke, GA180-day data center moratorium City / Town Moratorium No end date
Pike County, GAdata center moratorium County / Parish Moratorium Since Sep 2025 · no end date
Savannah, GA155-day large-scale data center moratorium City / Town Moratorium Since Aug 2026 · no end date
Social Circle, GAqualified local government decertification (DCA, one year) City / Town Other Since Sep 2026 · no end date
South Fulton, GAdata center permitting and performance standards City / Town Zoning Overlay / Special Use Permit Since Aug 2026 · no end date
Stephens County, GAdata center moratorium County / Parish Moratorium Jan 2027
Thomas County, GA1-yr data center moratorium County / Parish Moratorium Jan 2026 → Jan 2027
Walker County, GAdata center moratorium (through Feb. 5, 2027) County / Parish Moratorium Jul 2026 → Feb 2027
Walker County, GAdata center study group and siting guidelines (due Dec. 4, 2026) County / Parish Study / Review Sep 2026 → Dec 2026

Projects in Georgia →

North Carolina 43

JurisdictionLevelWhat it doesWindow
Beaufort County, NC1-yr data center application moratorium County / Parish Moratorium Since Oct 2026 · no end date
Chatham County, NC1-yr moratorium County / Parish Moratorium Feb 2026 → Feb 2027
City of Asheville, NC1-yr moratorium City / Town Moratorium Jun 2026 → Jun 2027
City of Boiling Spring Lakes, NC1-yr moratorium City / Town Moratorium Jun 2026 → Jun 2027
City of Brevard, NCdata centers limited to industrial districts by conditional rezoning (Ord. 2026-19) City / Town Zoning Overlay / Special Use Permit Since May 2026 · no end date
City of Charlotte, NC150-day moratorium City / Town Moratorium Jun 2026 → Nov 2026
City of Durham, NC1-yr moratorium (extended) City / Town Moratorium May 2026 → May 2027
City of Kings Mountain, NC1-year data center moratorium extension City / Town Moratorium Aug 2026 → Aug 2027
City of Mount Airy, NC60-day data center moratorium City / Town Moratorium Jul 2026 → Dec 2026
City of Raleigh, NC6-mo data center moratorium (>10,000 sf or >5 MW) City / Town Moratorium Oct 2026 → Apr 2027
City of Wilson, NC1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
Clay County (permanent restriction after earlier crypto moratorium), NCdata center moratorium County / Parish Moratorium Since Jan 2026 · no end date
Clay County, NCban on commercial data centers of 2 MW or more County / Parish Outright Ban Since Jan 2026 · no end date
Cumberland County, NC6-mo moratorium County / Parish Moratorium Jun 2026 → Dec 2026
Davie County, NC1-yr moratorium County / Parish Moratorium Jul 2026 → Jul 2027
Durham County, NC1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Elizabeth City data center moratorium City / Town Moratorium Since Oct 2026 · no end date
Gates County, NC1-yr moratorium County / Parish Moratorium Feb 2026 → Feb 2027
Harnett County, NC1-yr moratorium County / Parish Moratorium May 2026 → May 2027
McDowell County, NC6-month data center moratorium County / Parish Moratorium Since Aug 2026 · no end date
North CarolinaSL 2026-41 electricity tax exemption repeal State Incentive Repeal / Tax Change Since Jul 2026 · no end date
Northampton County, NC32-mo moratorium County / Parish Moratorium May 2026 → Jan 2029
Orange County, NC1-yr moratorium County / Parish Moratorium Apr 2026 → Apr 2027
Pasquotank County, NC364-day data center moratorium County / Parish Moratorium May 2026 → May 2027
Rowan County, NC1-yr moratorium County / Parish Moratorium Apr 2026 → Apr 2027
Surry County, NC731-day data center moratorium County / Parish Moratorium Jun 2026 → Jun 2028
Swain County, NC1-yr moratorium County / Parish Moratorium Apr 2026 → Apr 2027
Town of Apex, NC1-yr zoning suspension City / Town Moratorium Apr 2026 → Apr 2027
Town of Bailey, NC300-day data center moratorium City / Town Moratorium May 2026 → Mar 2027
Town of Boone, NC1-yr moratorium City / Town Moratorium Mar 2026 → Mar 2027
Town of Canton, NC1-yr moratorium City / Town Moratorium Feb 2026 → Feb 2027
Town of Cary, NC18-month data center moratorium City / Town Moratorium Aug 2026 → Feb 2028
Town of Clyde, NC1-yr data center moratorium City / Town Moratorium Apr 2026 → Apr 2027
Town of Franklin, NC1-yr moratorium City / Town Moratorium Jul 2026 → Jul 2027
Town of Hillsborough, NC1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
Town of Holly Springs, NC1-yr moratorium City / Town Moratorium Jun 2026 → Jun 2027
Town of Southport, NC15-month data center moratorium City / Town Moratorium Since Sep 2026 · no end date
Town of Spring Hope, NC1-yr moratorium City / Town Moratorium May 2026 → May 2027
Town of Wendell, NC7-mo moratorium City / Town Moratorium May 2026 → Dec 2026
Town of Woodfin, NC1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
Vance County, NC60-day data center moratorium County / Parish Moratorium Since Sep 2026 · no end date
Watauga County, NC1-yr data center moratorium County / Parish Moratorium Apr 2026 → Apr 2027
Yadkin County, NC2-year unincorporated-area data center moratorium County / Parish Moratorium No end date

Projects in North Carolina →

Iowa 30

JurisdictionLevelWhat it doesWindow
Adair County, IAdata center moratorium County / Parish Moratorium Since Mar 2026 · no end date
Audubon County, IAdata center moratorium County / Parish Moratorium May 2026 → May 2027
Boone County, IAup to 1-yr new data center moratorium County / Parish Moratorium Since Sep 2026 · no end date
Cascade, IA1-year data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Cedar County, IA6-mo data center moratorium County / Parish Moratorium May 2026 → Nov 2026
City of Ames, IA9-month data center delay City / Town Pause Since Jul 2026 · no end date
City of Marshalltown, IA120-day data center moratorium City / Town Moratorium Since Aug 2026 · no end date
City of Peosta, IA6-mo data center moratorium City / Town Moratorium Jun 2026 → Dec 2026
Clarke County, IAdata center moratorium County / Parish Moratorium Since Jun 2025 · no end date
Clayton County, IAdata center moratorium County / Parish Moratorium Feb 2025 → Dec 2026
Des Moines County, IA1-yr data center moratorium County / Parish Moratorium May 2026 → May 2027
Dickinson County, IA6-mo data center moratorium County / Parish Moratorium May 2026 → Nov 2026
Dubuque County, IA1-yr data center moratorium County / Parish Moratorium May 2026 → May 2027
Franklin County, IAdata center moratorium County / Parish Moratorium Since Mar 2026 · no end date
Ida County, IAdata center moratorium County / Parish Moratorium Since Jun 2026 · no end date
Johnson County, IAdata center moratorium County / Parish Moratorium Nov 2025 → Aug 2027
Lee County, IA1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Linn County, IAdata center moratorium County / Parish Moratorium Jul 2026 → Jan 2028
Madison County, IA1-yr data center moratorium County / Parish Moratorium May 2026 → May 2027
Mitchell County, IAdata center moratorium County / Parish Moratorium Nov 2025 → Dec 2026
Palo Alto County, IAdata center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
Plymouth County, IA1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Shelby County, IAdata center moratorium County / Parish Moratorium Mar 2026 → Jul 2027
Sioux County, IA1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Story County, IAdata center moratorium County / Parish Moratorium Jun 2025 → Mar 2027
Tama County, IAdata center moratorium County / Parish Moratorium Since Nov 2025 · no end date
Taylor County, IAdata center moratorium County / Parish Moratorium Since May 2026 · no end date
Union County, IA1-yr data center moratorium County / Parish Moratorium Mar 2026 → Mar 2027
Winneshiek County data center moratorium County / Parish Moratorium Since Sep 2026 · no end date
Woodbury County, IA1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027

Projects in Iowa →

Wisconsin 25

JurisdictionLevelWhat it doesWindow
City of Janesville, WI12-month data center moratorium City / Town Moratorium Since Sep 2026 · no end date
City of Madison, WI1-yr data center moratorium City / Town Moratorium Jan 2026 → Jan 2027
City of Milwaukee, WIproposed 1-year data center moratorium City / Town Moratorium Since Oct 2026 · no end date
City of Sheboygan, WI1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027
City of Superior, WI1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Dane County, WI548-day data center moratorium County / Parish Moratorium Jun 2026 → Dec 2027
Door County, WI1-yr data center moratorium County / Parish Moratorium May 2026 → May 2027
Grant County, WI1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Green County, WI1-yr data center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
La Crosse County, WI548-day data center moratorium County / Parish Moratorium Jun 2026 → Dec 2027
Manitowoc County, WIdata center moratorium County / Parish Moratorium Since Apr 2026 · no end date
Monroe County, WI548-day data center moratorium County / Parish Moratorium Jul 2026 → Jan 2028
Oneida County, WI1-year data center moratorium County / Parish Moratorium Since Aug 2026 · no end date
Oshkosh, WI12-mo data center moratorium City / Town Moratorium Since Sep 2026 · no end date
Shawano County, WI1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Town of Beloit, WI12-month data center moratorium Township / Village Moratorium Since Oct 2026 · no end date
Town of Cassville, WIinterim data center moratorium City / Town Moratorium Since Apr 2026 · no end date
Town of New Denmark, WI1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Village of Ashwaubenon, WI1-yr data center moratorium Township / Village Moratorium Jun 2026 → Jun 2027
Village of Cottage Grove, WI1-yr data center moratorium Township / Village Moratorium Jul 2026 → Jul 2027
Village of Hobart, WI1-yr data center moratorium Township / Village Moratorium Jul 2026 → Jul 2027
Village of Wrightstown, WI1-yr data center moratorium Township / Village Moratorium Jun 2026 → Jun 2027
WisconsinWe Energies Very Large Customer tariff (≥100 MW, 15-year minimum term) Utility / Grid Large-Load / Interconnection Rule Since Apr 2026 · no end date
Wisconsin Rapids, WIdata center overlay district City / Town Zoning Overlay / Special Use Permit No end date
Wisconsin Rapids, WIproposed data-center moratorium City / Town Moratorium Since Oct 2026 · no end date

Projects in Wisconsin →

California 24

JurisdictionLevelWhat it doesWindow
California AB 1577 data center energy reporting to the CEC State Other Since Jan 2027 · no end date
California AB 2469 data center water conditions on local permits State Siting / Noise / Water Restriction Since Jan 2027 · no end date
California AB 2619 data center water reporting on business licenses State Other Since Jan 2027 · no end date
California SB 1168 CPUC data center rate-structure study State Study / Review Since Jan 2027 · no end date
California SB 886 / AB 2383 data center electricity tariffs State Large-Load / Interconnection Rule Since Jan 2027 · no end date
California SB 887 data center CEQA review State Siting / Noise / Water Restriction Since Jan 2027 · no end date
Coachella, CAdata center moratorium City / Town Moratorium Since Jun 2026 · no end date
Desert Hot Springs, CA45-day data center moratorium City / Town Moratorium Jun 2026 → Jun 2028
El Monte, CA45-day data center moratorium City / Town Moratorium Mar 2026 → Mar 2027
Escondido, CAdata center ban through August 2027 City / Town Moratorium No end date
Gilroy temporary data center moratorium City / Town Moratorium Since Sep 2026 · no end date
Hayward, CAinterim urgency moratorium on new data centers (LB 26-015) City / Town Moratorium Oct 2026 → Dec 2026
Irwindale, CAdata center ban ordinance City / Town Outright Ban Since Oct 2026 · no end date
Lake Elsinore data center moratorium City / Town Moratorium No end date
Los Angeles County unincorporated hyperscale data center freeze County / Parish Moratorium Since Sep 2026 · no end date
Monterey Park, CAvoter-approved data center ban (June 2, 2026) City / Town Outright Ban Since Jun 2026 · no end date
Oakland proposed 45-day data center moratorium City / Town Moratorium Since Oct 2026 · no end date
Oakley, CA45-day data center moratorium City / Town Moratorium Apr 2026 → Apr 2027
Perris, CAdata center ban City / Town Outright Ban No end date
San Francisco proposed 45-day data center moratorium City / Town Moratorium Since Oct 2026 · no end date
San Joaquin County, CA45-day data center moratorium (unincorporated) County / Parish Moratorium Since Oct 2026 · no end date
Silicon Valley Power pause on new data center load requests Utility / Grid Large-Load / Interconnection Rule Since Jan 2023 · no end date
South El Monte, CA45-day data center and BESS moratorium City / Town Moratorium Since Oct 2026 · no end date
Tulare County, CAdata center urgency moratorium County / Parish Moratorium Aug 2026 → Aug 2027

Projects in California →

Florida 22

JurisdictionLevelWhat it doesWindow
Alachua County, FLlarge-scale data centers not a permitted use County / Parish Outright Ban No end date
Calhoun County, FL1-yr data center moratorium County / Parish Moratorium No end date
Citrus County, FL1-yr data center moratorium County / Parish Moratorium May 2026 → May 2027
Clay County, FL1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
DeSoto County, FL1-yr data center moratorium (pending applications exempt) County / Parish Moratorium Jul 2026 → Jul 2027
FloridaSB 484 (Ch. 2026-65) large-load customer cost allocation, water permitting and local authority State Large-Load / Interconnection Rule Since Jul 2026 · no end date
Hernando County, FL1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Jackson County, FLdata centers prohibited in the unincorporated county County / Parish Outright Ban Since Jun 2026 · no end date
Lakeland, FL1-yr data center moratorium City / Town Moratorium Aug 2026 → Aug 2027
Leon County, FLproposed 18-month moratorium on large-load facilities and data centers County / Parish Moratorium Since Oct 2026 · no end date
Levy County, FLtemporary data center and large-load moratorium County / Parish Moratorium Since Sep 2026 · no end date
Lynn Haven, FL60-day data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Madison County, FL1-yr data center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
Manatee County, FL12-month data center and large-load moratorium County / Parish Moratorium Oct 2026 → Oct 2027
Nassau County, FL1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Osceola County, FLlarge-scale data center applications deferred pending state study County / Parish Study / Review Since Jun 2026 · no end date
Palm Beach County, FLdata center moratorium County / Parish Moratorium Jul 2026 → Sep 2027
Pasco County, FL1-yr data center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
Pinellas Park, FLproposed data center moratorium City / Town Moratorium Since Aug 2026 · no end date
Santa Rosa County, FL1-yr data center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
Sarasota County, FL1-yr data center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
Zephyrhills, FL1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027

Projects in Florida →

Tennessee 22

JurisdictionLevelWhat it doesWindow
Anderson County, TN2-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2028
Bristol, TN2-yr data center moratorium City / Town Moratorium Oct 2025 → Oct 2027
Cedar Hill, TN2-yr data center moratorium City / Town Moratorium Jun 2026 → May 2028
Clinton, TN6-mo data center moratorium City / Town Moratorium Jun 2026 → Dec 2026
Coffee County, TN1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Cumberland County, TN2-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2028
Gallatin, TNdata center zoning (setbacks, Planning Commission review) City / Town Siting / Noise / Water Restriction No end date
Grundy County, TN731-day data center moratorium County / Parish Moratorium May 2026 → May 2028
Hawkins County, TNdata center moratorium County / Parish Moratorium Since Sep 2025 · no end date
Knox County, TN373-day data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Knoxville, TN1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027
Loudon County, TN6-mo data center moratorium County / Parish Moratorium Jun 2026 → Dec 2026
McMinnville, TN545-day data center moratorium City / Town Moratorium Jun 2026 → Nov 2027
Millington, TN6-month data center moratorium City / Town Moratorium Oct 2026 → Apr 2027
Morgan County, TN2-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2028
Nashville-Davidson County data center zoning (BL2026-1391 / BL2026-1392) City / Town Zoning Overlay / Special Use Permit Since Jul 2026 · no end date
Nashville-Davidson County, TNdata center moratorium City / Town Moratorium Jul 2026 → Dec 2026
Shelbyville, TN1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027
Unincorporated Hamilton County, TN1-yr data center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
Warren County, TN1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Washington County, TNdata center moratorium County / Parish Moratorium Mar 2026 → Jun 2027
White County, TNdata center moratorium County / Parish Moratorium Since Jul 2026 · no end date

Projects in Tennessee →

Colorado 20

JurisdictionLevelWhat it doesWindow
Archuleta County, CO6-mo data center moratorium County / Parish Moratorium Jun 2026 → Dec 2026
Arvada, CO18-month primary-use data center moratorium City / Town Moratorium Since Oct 2026 · no end date
Aurora, COevaporative cooling restriction and data centre standards City / Town Siting / Noise / Water Restriction Since Sep 2026 · no end date
Boulder County, CO6-mo data center moratorium County / Parish Moratorium Jun 2026 → Nov 2026
Brighton, CO1-year data center moratorium City / Town Moratorium No end date
Broomfield, CO548-day data center moratorium City / Town Moratorium Jul 2026 → Jan 2028
Buena Vista, COdata center moratorium City / Town Moratorium Jun 2026 → Dec 2026
Colorado Springs, COdata centre development standards City / Town Siting / Noise / Water Restriction No end date
Delta County, COdata center moratorium County / Parish Moratorium Jul 2026 → Jan 2027
Denver, CO1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
Hudson, COdata center moratorium City / Town Moratorium Since Jul 2026 · no end date
Jefferson County, COdata center moratorium County / Parish Moratorium Since May 2026 · no end date
Larimer County, CO30-day data center moratorium County / Parish Moratorium Jan 2026 → Feb 2027
Lochbuie, CO5-yr data center moratorium Municipality Moratorium Jul 2026 → Jul 2031
Loveland, CO12-mo large-scale data center application suspension City / Town Moratorium Sep 2026 → Sep 2027
Mesa County, CO1-year data center moratorium County / Parish Moratorium Since Sep 2026 · no end date
Monument, CO6-mo data center moratorium City / Town Moratorium Jul 2026 → Jan 2027
South Fork, CO1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Weld County, COdata centre land-use code (will-serve and water proof) County / Parish Zoning Overlay / Special Use Permit Since Apr 2026 · no end date
Woodland Park, COdata center moratorium City / Town Moratorium Since Jul 2026 · no end date

Projects in Colorado →

Alabama 19

JurisdictionLevelWhat it doesWindow
Alabama Act 2026-610large-load data center contract standard (SB 270) State Large-Load / Interconnection Rule Since Oct 2026 · no end date
Alabama data center abatement term cut20-year maximum from 2027 State Incentive Repeal / Tax Change Since Jan 2027 · no end date
Anniston, AL1-yr data center moratorium City / Town Moratorium Aug 2026 → Aug 2027
Birmingham, ALpermanent data center zoning regulations City / Town Zoning Overlay / Special Use Permit Since Aug 2026 · no end date
Calera, ALdata center moratorium City / Town Moratorium No end date
Chelsea, ALdata center moratorium City / Town Moratorium No end date
Cullman, AL1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Fairfield, AL6-mo data center moratorium City / Town Moratorium Jul 2026 → Jan 2027
Foley, AL6-mo data center moratorium City / Town Moratorium Since Sep 2026 · no end date
Fort Payne, AL6-mo data center moratorium City / Town Moratorium Jun 2026 → Dec 2026
Harpersville, AL6-mo data center moratorium City / Town Moratorium Aug 2026 → Feb 2027
Helena, ALdata center pause City / Town Pause No end date
Homewood, AL1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Leeds, AL1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Pinson, AL1-yr data center moratorium City / Town Moratorium No end date
Prichard, ALproposed data center moratorium City / Town Moratorium Aug 2026 → Feb 2027
Springville, ALdata center moratorium City / Town Moratorium No end date
Tarrant, AL1-yr data center business license moratorium City / Town Moratorium Sep 2026 → Sep 2027
Westover, AL6-mo data center moratorium City / Town Moratorium Aug 2026 → Feb 2027

Projects in Alabama →

Kentucky 19

JurisdictionLevelWhat it doesWindow
Bell County, KY2-yr data center moratorium County / Parish Moratorium Jul 2026 → Jul 2028
Boyle County, KY1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Breckinridge County, KY1-yr data center moratorium County / Parish Moratorium Dec 2025 → Dec 2026
Bullitt County, KY1-yr data center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
Cave City, KY1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
Daviess County, KY1-yr data center moratorium County / Parish Moratorium May 2026 → May 2027
Edmonson County, KY1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Harrodsburg, KYIT zone ordinance City / Town Zoning Overlay / Special Use Permit Since Oct 2026 · no end date
Jenkins, KY2-year hyperscale data center moratorium City / Town Moratorium Since Oct 2026 · no end date
Lexington, KYdata center moratorium City / Town Moratorium Jun 2026 → Oct 2026
Meade County Fiscal Court, KY1-yr data center moratorium County / Parish Moratorium Jan 2026 → Jan 2027
Mercer County data center moratorium County / Parish Moratorium No end date
Mercer County Fiscal Court, KY1-yr data center moratorium County / Parish Moratorium Aug 2026 → Aug 2027
Nelson County, KY1-yr data center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
Oldham County Fiscal Court, KY150-day data center moratorium County / Parish Moratorium Since Jun 2025 · no end date
Oldham County, KYdata center regulations with 10 MW cap County / Parish Siting / Noise / Water Restriction Since Oct 2026 · no end date
Simpson County, KYconditional use permit required for data centers countywide County / Parish Zoning Overlay / Special Use Permit No end date
Versailles, KYdata center moratorium City / Town Moratorium Jun 2026 → Dec 2026
Woodford County data center, landfill and large-BESS construction ban County / Parish Outright Ban Since Sep 2026 · no end date

Projects in Kentucky →

Illinois 18

JurisdictionLevelWhat it doesWindow
Champaign County, IL1-yr data center moratorium County / Parish Moratorium Apr 2026 → Apr 2027
Champaign County, ILresolution prohibiting tax abatements for hyperscale data centers County / Parish Incentive Repeal / Tax Change Since Oct 2026 · no end date
City of Bloomington, IL6-mo data center moratorium City / Town Moratorium May 2026 → Nov 2026
City of Carbondale, IL1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
City of Collinsville, IL1-yr data center moratorium City / Town Moratorium No end date
City of Effingham, IL1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
City of Mattoon, IL1-year large-scale data center moratorium City / Town Moratorium Since Sep 2026 · no end date
City of Ottawa, ILdata center moratorium extended to 2027-08-25 City / Town Moratorium Aug 2026 → Aug 2027
City of Troy, IL6-mo data center moratorium City / Town Moratorium Mar 2026 → Mar 2027
City of West Chicago, IL6-mo data center moratorium City / Town Moratorium Jul 2026 → Jan 2027
Illinois, ILproposed 2-year data center tax incentive pause State Incentive Repeal / Tax Change Jul 2026 → Jul 2028
La Salle County, IL1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Lake County, IL8-month unincorporated data center moratorium County / Parish Moratorium Sep 2026 → May 2027
Lee County, IL90-day data center and tech-development moratorium County / Parish Moratorium Aug 2026 → Nov 2026
Morgan County, IL6-mo data center moratorium County / Parish Moratorium Apr 2026 → Oct 2026
South Elgin data center moratorium City / Town Moratorium No end date
Town of Normal, ILdata center moratorium City / Town Moratorium May 2026 → Nov 2026
Village of Godfrey, ILdata center moratorium Township / Village Moratorium Jan 2026 → Jan 2027

Projects in Illinois →

Missouri 18

JurisdictionLevelWhat it doesWindow
Ameren MissouriLarge Load Customer Service tariff, Schedule LLCS (PSC ET-2025-0184) Utility / Grid Large-Load / Interconnection Rule Since Dec 2025 · no end date
City of Camdenton, MO1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
City of Columbia, MOdata center moratorium City / Town Moratorium Since May 2026 · no end date
City of Independence, MO6-mo data center moratorium City / Town Moratorium Jul 2026 → Jan 2027
City of Independence, MOdata center and BESS zoning standards City / Town Zoning Overlay / Special Use Permit Since Oct 2026 · no end date
City of Marshfield, MOdata center definition and heavy-industrial conditional use City / Town Zoning Overlay / Special Use Permit Since Apr 2026 · no end date
City of Neosho, MO1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027
City of Springfield, MO120-day data center moratorium City / Town Moratorium Jun 2026 → Oct 2026
City of St. Joseph, MO1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027
City of St. Louis, MOBoard Bill 49 data-center zoning overlay City / Town Zoning Overlay / Special Use Permit Since Sep 2026 · no end date
City of St. Peters, MO1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
Jackson County, MO6-mo data center moratorium County / Parish Moratorium Jun 2026 → Dec 2026
Marion County, MO1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Nodaway County, MO6-mo data center moratorium County / Parish Moratorium Jul 2026 → Jan 2027
Palmyra, MOdata center moratorium City / Town Moratorium Since Sep 2026 · no end date
Pettis County, MOdata center moratorium County / Parish Moratorium Since Oct 2026 · no end date
St. Charles County, MO6-mo data center moratorium County / Parish Moratorium Jul 2026 → Jan 2027
Webster County, MO6-mo data center moratorium County / Parish Moratorium Jun 2026 → Dec 2026

Projects in Missouri →

Texas 18

JurisdictionLevelWhat it doesWindow
16 TAC §25.194 Large Load Interconnection Standards (PUCT Project 58481) State Large-Load / Interconnection Rule Since Oct 2026 · no end date
16 TAC §25.205 Net Metering for Large Loads Co-Located at Existing Generation (PUCT Project 58479) State Large-Load / Interconnection Rule Since Apr 2026 · no end date
16 TAC §25.370 ERCOT Large Load Forecasting Criteria (PUCT Project 58480) State Large-Load / Interconnection Rule Since Mar 2026 · no end date
Athens, TXdata center zoning ban City / Town Outright Ban Since Aug 2026 · no end date
Baytown, TXproposed data center definition / use standards City / Town Zoning Overlay / Special Use Permit Since Sep 2026 · no end date
Brownsville, TX90-day pause on data center rezoning City / Town Pause Since Sep 2026 · no end date
Denton, TXDevelopment Code data-center use-standard amendments (DCA26-0007) City / Town Zoning Overlay / Special Use Permit Since Oct 2026 · no end date
Edinburg, TXdata center special use permit amendment City / Town Zoning Overlay / Special Use Permit Since Oct 2026 · no end date
El Paso County, TXspecial permit, disclosures, and 300-foot residential buffer County / Parish Zoning Overlay / Special Use Permit No end date
Hays County, TX180-day high-water-use approval pause County / Parish Pause Jun 2026 → Dec 2026
Kerrville, TXpark, school, church, and arterial setbacks City / Town Siting / Noise / Water Restriction No end date
Lewisville, TXresidential ban and special-use permit with two hearings City / Town Zoning Overlay / Special Use Permit No end date
Lubbock, TXcouncil resolution: standards required before new large-scale data centers City / Town Study / Review Since Sep 2026 · no end date
Mesquite, TXtechnical, noise, and water-impact studies City / Town Siting / Noise / Water Restriction Since Jun 2026 · no end date
San Marcos, TXcitywide data center zoning ban City / Town Outright Ban Since Jun 2026 · no end date
Temple, TXUDC data-center CUP, closed-loop cooling and buffering standards City / Town Zoning Overlay / Special Use Permit Since Sep 2026 · no end date
Texas TCEQ data-center permit halt pending ERCOT / TWDB audits State Pause Since Sep 2026 · no end date
Texas, TXERCOT large-load interconnection halt pending audit State Pause Since Aug 2026 · no end date

Projects in Texas →

Virginia 18

JurisdictionLevelWhat it doesWindow
Amherst County, VAdata centers require special-use permit County / Parish Zoning Overlay / Special Use Permit Since Aug 2026 · no end date
Appalachian Power Schedule L.P.S. Large-Load Tariff Revisions (PUR-2025-00057) Utility / Grid Large-Load / Interconnection Rule No end date
Campbell County, VAdata centers require a special use permit in heavy industrial zones County / Parish Zoning Overlay / Special Use Permit Since May 2026 · no end date
Carroll County emergency ordinance regulating hyperscale data centers County / Parish Siting / Noise / Water Restriction Since Sep 2026 · no end date
City of Chesapeake, VAdata center moratorium City / Town Moratorium Since Jul 2026 · no end date
City of Chesapeake, VAdata centers end as by-right; CUP, industrial districts only, no groundwater City / Town Zoning Overlay / Special Use Permit Since Aug 2026 · no end date
City of Lynchburg, VAdata centers require a conditional use permit in four districts City / Town Zoning Overlay / Special Use Permit Since Jul 2026 · no end date
City of Virginia Beach, VA12-month moratorium on new data center permits City / Town Moratorium Since Aug 2026 · no end date
Dominion Energy Virginia GS-5 Large-Load Rate Class (PUR-2025-00058) Utility / Grid Large-Load / Interconnection Rule Since Jan 2027 · no end date
Fauquier Countystricter data-center zoning rules (Planning Commission recommendation) County / Parish Zoning Overlay / Special Use Permit Since Oct 2026 · no end date
Frederick County, VAdata centers removed as an allowed use County / Parish Outright Ban Since Sep 2026 · no end date
Henrico County, VAdata centers require provisional use permit; 500-foot residential setback County / Parish Zoning Overlay / Special Use Permit Since Jun 2025 · no end date
Loudoun County, VAdata centers require special exception (ZOAM, Phase 1) County / Parish Zoning Overlay / Special Use Permit Since Mar 2025 · no end date
Loudoun County, VAproposed moratorium on new data center applications County / Parish Moratorium Since Sep 2026 · no end date
Prince William County, VADCOZOD amendment ending by-right data centers (DPA2026-00006) County / Parish Zoning Overlay / Special Use Permit Since Sep 2026 · no end date
Town of Front Royal60-day extension of data-center application moratorium City / Town Moratorium Since Sep 2026 · no end date
Virginia Data Center Accountability FrameworkExecutive Order 22 State Siting / Noise / Water Restriction Since Sep 2026 · no end date
Virginia SCC mandatory CIAC for large-load substations (PUR-2026-00056) State Other Since Jul 2026 · no end date

Projects in Virginia →

Pennsylvania 17

JurisdictionLevelWhat it doesWindow
Bear Creek Township, PAdata center ordinance Township / Village Zoning Overlay / Special Use Permit Since Oct 2026 · no end date
Bensalem Township, PA6-mo data center moratorium Township / Village Moratorium Jun 2026 → Dec 2026
Bethlehem, PAdata center zoning amendment (special exception in the Industrial District) City / Town Zoning Overlay / Special Use Permit Since Oct 2026 · no end date
Brookville Borough, PA6-mo data center moratorium Other Moratorium Jun 2026 → Dec 2026
Butler Township, PA6-mo data center moratorium Township / Village Moratorium May 2026 → Nov 2026
Center Township, PA6-mo data center moratorium Township / Village Moratorium Jun 2026 → Dec 2026
East Huntingdon Township, PAdata center ordinance Township / Village Zoning Overlay / Special Use Permit No end date
East Whiteland Township, PAdata center ordinance Township / Village Zoning Overlay / Special Use Permit Since Sep 2026 · no end date
Hazle Township, PA6-mo data center moratorium Township / Village Moratorium Jun 2026 → Dec 2026
Lycoming County, PA6-mo data center moratorium County / Parish Moratorium Jun 2026 → Dec 2026
Middlesex Township Data Center Overlay District Township / Village Zoning Overlay / Special Use Permit Since May 2025 · no end date
Muncy Township, PA9-mo data center moratorium Township / Village Moratorium Apr 2026 → Jan 2027
Pennsylvania, PAEO 2026-05 GRID Requirements (>25 MW) State Other Since Aug 2026 · no end date
Somerset County, PAData Center Facilities Planning Ordinance County / Parish Siting / Noise / Water Restriction Since Oct 2026 · no end date
Swatara Township, PAdata centers added to SALDO; sites rezoned Mixed Use Township / Village Zoning Overlay / Special Use Permit No end date
Warrington Township, PAdata center moratorium Township / Village Moratorium Since May 2026 · no end date
West Hazleton, PAdata center ordinance Municipality Zoning Overlay / Special Use Permit Since Oct 2026 · no end date

Projects in Pennsylvania →

Indiana 16

JurisdictionLevelWhat it doesWindow
Boone County, IN1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Dearborn County, IN1-yr data center moratorium County / Parish Moratorium Feb 2026 → Feb 2027
Fayette County, IN1-yr data center moratorium County / Parish Moratorium May 2026 → May 2027
Franklin County, IN60-day data center moratorium County / Parish Moratorium Dec 2025 → Feb 2027
Fulton County, IN1-yr data center moratorium County / Parish Moratorium Mar 2026 → Mar 2027
Huntington County, INdata center moratorium County / Parish Moratorium Since Feb 2026 · no end date
Indianapolis (Marion County), INproposed data center moratorium City / Town Moratorium Aug 2026 → Dec 2027
Madison County, IN6-mo data center moratorium County / Parish Moratorium Jun 2026 → Dec 2026
Merrillville (Lake County), IN1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
Miami County, INdata center moratorium County / Parish Moratorium Since May 2026 · no end date
New Albany (Floyd County), IN1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027
Pulaski County, IN1-yr data center moratorium County / Parish Moratorium Jan 2026 → Jan 2027
Putnam County, IN1-yr data center moratorium County / Parish Moratorium Nov 2025 → Nov 2026
Shelby County, INdata center overlay (UDO text amendment) County / Parish Zoning Overlay / Special Use Permit Since Aug 2026 · no end date
South Bend (St. Joseph County), INexecutive order barring city staff from data-center NDAs City / Town Other Since Sep 2026 · no end date
Starke County, IN1-yr data center moratorium County / Parish Moratorium Dec 2025 → Dec 2026

Projects in Indiana →

New York 15

JurisdictionLevelWhat it doesWindow
East Fishkill data center moratorium City / Town Moratorium Jun 2026 → Jul 2029
Manlius, NY1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027
New York (Statewide), NYEO 62 1-yr DEC permit moratorium (≥50 MW) State Moratorium Jul 2026 → Jul 2027
Orangetown, NYlocal data center moratorium (DataBank exempt) City / Town Moratorium No end date
Town of Brookhaven, NY545-day data center moratorium City / Town Moratorium Jul 2026 → Jan 2028
Town of Clifton Park, NY1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027
Town of East Fishkill, NYdata center moratorium City / Town Moratorium Jun 2026 → Jul 2029
Town of Highland, NY1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Town of Lewiston (Niagara County) - proposed, public hearing held, NY548-day data center moratorium City / Town Moratorium No end date
Town of Lysander (Onondaga County) - drafting authorized, NYproposed data center moratorium City / Town Moratorium May 2026 → Nov 2026
Town of Oneonta (Otsego County) - proposed, pending, NY1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
Town of Salina, NY1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
Town of Southeast, NY6-mo data center moratorium City / Town Moratorium May 2026 → Nov 2026
Town of Thurston, NY2-yr data center moratorium City / Town Moratorium May 2026 → May 2028
Town of Van Buren, NY1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027

Projects in New York →

Minnesota 13

JurisdictionLevelWhat it doesWindow
Carver, MN1-yr data center moratorium City / Town Moratorium Apr 2026 → Apr 2027
City of Apple Valley, MN1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027
City of Elko New Market, MNdata center moratorium City / Town Moratorium Since May 2026 · no end date
Eagan, MNdata center moratorium City / Town Moratorium Since Feb 2026 · no end date
Inver Grove Heights, MNone-year data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Le Sueur County, MN1-yr data center moratorium County / Parish Moratorium May 2026 → May 2027
Mankato, MN1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027
Minneapolis, MN1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
North Mankato, MN12-month data center moratorium City / Town Moratorium Since Sep 2026 · no end date
Rosemount, MN1-yr data center moratorium City / Town Moratorium Apr 2026 → Apr 2027
Sartell, MNdata center conditional use permit City / Town Zoning Overlay / Special Use Permit No end date
Waite Park, MN1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
Wright County, MN1-yr data center moratorium County / Parish Moratorium May 2026 → May 2027

Projects in Minnesota →

Kansas 11

JurisdictionLevelWhat it doesWindow
Brown County, KS540-day data center moratorium County / Parish Moratorium Mar 2026 → Aug 2027
Geary County, KS1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Harvey County, KSdata center moratorium County / Parish Moratorium Jan 2026 → Jan 2029
KansasEvergy large-load power service rate plan (≥75 MW) State Other Since Sep 2026 · no end date
Kingman County, KS540-day data center moratorium County / Parish Moratorium Feb 2026 → Aug 2027
Lyon County, KSdata center moratorium County / Parish Moratorium Jul 2026 → Jan 2027
Marion County, KSdata center moratorium County / Parish Moratorium Mar 2026 → Jun 2027
McPherson County, KSdata center moratorium County / Parish Moratorium Aug 2025 → Dec 2026
Riley County, KS178-day data center moratorium County / Parish Moratorium May 2026 → Nov 2026
Saline County, KS1-yr data center moratorium County / Parish Moratorium Mar 2026 → Mar 2027
Sedgwick County, KS90-day data center moratorium County / Parish Moratorium Jan 2026 → Dec 2026

Projects in Kansas →

Oregon 11

JurisdictionLevelWhat it doesWindow
Forest Grove, OR120-day moratorium on new data centers and expansions of 20% or more City / Town Moratorium Oct 2026 → Feb 2027
Hillsboro Phase I data center and energy storage code amendments (Ordinance 6521 / CDCA-004-26) City / Town Zoning Overlay / Special Use Permit Since Nov 2026 · no end date
Hillsboro, OR120-day data center & BESS application moratorium City / Town Moratorium Jul 2026 → Nov 2026
Oregon (Statewide)pause on air and water pollution permits for new or expanded data centers State Moratorium Oct 2026 → Jul 2027
Oregon (Statewide)POWER Act cost-reflective rates for 20 MW+ loads State Large-Load / Interconnection Rule No end date
Oregon statewide pause on unapproved data-center use of state land State Pause Sep 2026 → Jul 2027
Oregon temporary restriction on new data-center enterprise-zone exemptions State Incentive Repeal / Tax Change Since Jun 2026 · no end date
Portland data-center NDA resolution and intended hyperscale restrictions City / Town Other Since Sep 2026 · no end date
Salem 120-day moratorium on data centers City / Town Moratorium Sep 2026 → Jan 2027
Salem, ORprohibition on NDAs with data center entities City / Town Other Since Oct 2026 · no end date
Woodburn 120-day moratorium on new data centers City / Town Moratorium Sep 2026 → Jan 2027

Projects in Oregon →

Maine 10

JurisdictionLevelWhat it doesWindow
Bangor, ME6-mo data center moratorium City / Town Moratorium Apr 2026 → Apr 2027
Brunswick, ME6-mo data center moratorium City / Town Moratorium Jun 2026 → Nov 2026
Bucksport, ME6-mo data center moratorium City / Town Moratorium Since Oct 2026 · no end date
Eastport, MElarge-scale and underwater data center ban City / Town Outright Ban Since Sep 2026 · no end date
Gorham, ME6-mo data center moratorium City / Town Moratorium Jun 2026 → Nov 2026
Paris, ME180-day data center moratorium City / Town Moratorium Since Sep 2026 · no end date
Sanford, MEdata center moratorium City / Town Moratorium Since May 2026 · no end date
Scarborough, ME6-mo data center moratorium City / Town Moratorium Jun 2026 → Nov 2026
South Berwick, MEdata center moratorium City / Town Moratorium No end date
Westbrook, ME6-mo data center moratorium City / Town Moratorium Jun 2026 → Nov 2026

Projects in Maine →

Maryland 10

JurisdictionLevelWhat it doesWindow
Anne Arundel County, MDdata center moratorium County / Parish Moratorium Sep 2026 → Jan 2028
Baltimore County, MDdata center moratorium County / Parish Moratorium Feb 2026 → Dec 2027
Calvert County, MDdata center moratorium County / Parish Moratorium Since Aug 2026 · no end date
Frederick County, MDdata center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
Harford County, MDdata center ban County / Parish Outright Ban No end date
Maryland statewide large data center review (Governor Moore executive order) State Study / Review Since Sep 2026 · no end date
Montgomery County, MD548-day data center moratorium County / Parish Moratorium Jul 2026 → Jan 2028
Prince George's County, MDtwo-year qualified data center moratorium (CR-066-2026) County / Parish Moratorium Jul 2026 → Jul 2028
Washington County, MD1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
Worcester County, MDproposed data center moratorium County / Parish Moratorium Jul 2026 → Jul 2027

Projects in Maryland →

Nebraska 10

JurisdictionLevelWhat it doesWindow
Cass County, NEdata center moratorium County / Parish Moratorium Aug 2026 → Aug 2027
Cherry County, NE6-mo data center moratorium County / Parish Moratorium Jul 2026 → Jan 2027
Custer County, NEdata center zoning regulations County / Parish Zoning Overlay / Special Use Permit Since Oct 2026 · no end date
Logan County, NE1-yr data center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
Nebraska, NEDWEE Data Center Task Force State Study / Review No end date
Nebraska, NEImagiNE Act data center incentive bar State Incentive Repeal / Tax Change Since Jul 2026 · no end date
Nebraska, NELB1010 Large Load Customer Regulation Act State Other Since Apr 2026 · no end date
Nehawka, NEvillage data center ban Township / Village Outright Ban Since Aug 2026 · no end date
Otoe County, NE1-yr data center moratorium County / Parish Moratorium May 2026 → May 2027
Seward County, NE1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027

Projects in Nebraska →

Washington 10

JurisdictionLevelWhat it doesWindow
Burien, WA1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
City of Ellensburg, WA6-mo data center moratorium City / Town Moratorium Oct 2026 → Apr 2027
City of Seattle, WA1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Federal Way, WA1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027
Kittitas County, WA12-mo data center application moratorium (extended) County / Parish Moratorium Since Aug 2026 · no end date
Marysville, WA6-mo data center moratorium City / Town Moratorium Jul 2026 → Jan 2027
Pasco, WAdata center moratorium City / Town Moratorium No end date
Skagit County, WA6-mo data center moratorium County / Parish Moratorium Jun 2026 → Nov 2026
Snohomish County, WA6-mo data center moratorium County / Parish Moratorium Jun 2026 → Dec 2026
Spokane, WA1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027

Projects in Washington →

Massachusetts 9

JurisdictionLevelWhat it doesWindow
Agawam, MAdata center moratorium City / Town Moratorium No end date
Easthampton 18-month data center moratorium City / Town Moratorium Since Oct 2026 · no end date
Everett (restriction proposal, not moratorium), MAdata center moratorium City / Town Moratorium Since Jun 2026 · no end date
Leominster, MA1-year data center moratorium City / Town Moratorium Sep 2026 → Jul 2027
Lowell, MA360-day data center moratorium City / Town Moratorium Mar 2026 → Mar 2027
Malden, MA1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
Massachusetts EO 658 data-center local-approval and community-benefits rule State Siting / Noise / Water Restriction Since Sep 2026 · no end date
Salem, MAproposed data center ban City / Town Outright Ban Since Oct 2026 · no end date
Westfield, MA1-yr data center moratorium City / Town Moratorium Jul 2026 → Jul 2027

Projects in Massachusetts →

New Jersey 9

JurisdictionLevelWhat it doesWindow
Bridgewater Township, NJdata center performance standards (Ordinance 26-15) Township / Village Zoning Overlay / Special Use Permit Since Sep 2026 · no end date
Galloway Township, NJ6-mo data center moratorium Township / Village Moratorium Jun 2026 → Dec 2026
Hackettstown, NJdata center ban Municipality Outright Ban Since Oct 2026 · no end date
Jersey City Industrial District standalone data-center ban (Ordinance 26-057) City / Town Outright Ban Since Aug 2026 · no end date
Manchester Township, NJdata centers removed from redevelopment plan (Ord. 26-48) Township / Village Outright Ban Since Sep 2026 · no end date
Millville, NJban on new data centers City / Town Outright Ban Since May 2026 · no end date
Monroe Township, NJdata center use removed (ban) Township / Village Outright Ban Since Apr 2026 · no end date
Old Bridge Township data center ban Township / Village Outright Ban Since Jul 2026 · no end date
Sayreville, NJ540-day data center moratorium City / Town Moratorium Jul 2026 → Jan 2028

Projects in New Jersey →

Utah 9

JurisdictionLevelWhat it doesWindow
Box Elder County, UT6-mo data center moratorium County / Parish Moratorium Jun 2026 → Dec 2026
Cache County, UT6-mo data center moratorium County / Parish Moratorium Jun 2026 → Dec 2026
Clearfield, UT180-day data center moratorium City / Town Moratorium Since Sep 2026 · no end date
Grand County, UT6-mo data center moratorium County / Parish Moratorium Jul 2026 → Jan 2027
Iron County, UT180-day data center moratorium County / Parish Moratorium May 2026 → Nov 2026
Logan, UT6-mo data center moratorium City / Town Moratorium Jun 2026 → Dec 2026
Salt Lake County unincorporated data-center regulations County / Parish Pause Since Sep 2026 · no end date
Spanish Fork Title 15 data center and onsite generation CUP City / Town Zoning Overlay / Special Use Permit Since Sep 2026 · no end date
Wayne County, UT6-mo data center moratorium County / Parish Moratorium Jul 2026 → Jan 2027

Projects in Utah →

Oklahoma 8

JurisdictionLevelWhat it doesWindow
Broken Arrow, OKdata center moratorium City / Town Moratorium Jun 2026 → Dec 2026
Edmond, OKdata center moratorium City / Town Moratorium Jun 2026 → Dec 2026
Luther, OKdata center moratorium City / Town Moratorium Jun 2026 → Dec 2026
Norman, OKdata center moratorium City / Town Moratorium Jun 2026 → Jun 2027
Oklahoma City, OKdata center moratorium City / Town Moratorium Apr 2026 → Dec 2026
Pawhuska, OKdata center moratorium City / Town Moratorium Apr 2026 → Dec 2026
Seminole Nation of Oklahoma, OKdata center moratorium Other Moratorium Since Mar 2026 · no end date
Tulsa, OKdata center moratorium City / Town Moratorium Mar 2026 → Dec 2026

Projects in Oklahoma →

South Carolina 8

JurisdictionLevelWhat it doesWindow
Chester County, SC6-mo data center moratorium County / Parish Moratorium Jul 2026 → Jan 2027
Chesterfield County, SCdata center moratorium County / Parish Moratorium Jun 2026 → Jan 2028
Colleton County, SC6-mo data center moratorium County / Parish Moratorium Jul 2026 → Jan 2027
Colleton County, SCDigital Infrastructure Overlay District County / Parish Zoning Overlay / Special Use Permit Since Sep 2026 · no end date
Greenwood County, SC1-yr data center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
Jasper County, SC1-year data center moratorium (pending final reading) County / Parish Moratorium No end date
Newberry County, SC1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
York County, SC9-mo data center moratorium County / Parish Moratorium Jul 2026 → Apr 2027

Projects in South Carolina →

Nevada 7

JurisdictionLevelWhat it doesWindow
Humboldt County, NVdata center moratorium County / Parish Moratorium Jul 2026 → Jul 2027
Las Vegas Valley, NVSNWA evaporative cooling ban (new construction) Special District Siting / Noise / Water Restriction Since Jan 2023 · no end date
Nevada EO 2026-005 data-center tax-abatement and community-commitment standards State Incentive Repeal / Tax Change Since Sep 2026 · no end date
Nye County, NVcountywide data center moratorium County / Parish Moratorium Since Jun 2026 · no end date
Nye County, NVdata center ban in over-appropriated water basin County / Parish Outright Ban Since May 2026 · no end date
Nye County, NVdata center special-use permit standards and development restrictions (outside Basin 162 / Pahrump ban) County / Parish Zoning Overlay / Special Use Permit Since Oct 2026 · no end date
Reno, NVmoratorium on new data center approvals City / Town Moratorium Jun 2026 → Aug 2027

Projects in Nevada →

Arizona 6

JurisdictionLevelWhat it doesWindow
Arizonadata center sales tax exemption repeal (proposed) State Incentive Repeal / Tax Change Jul 2026 → Jun 2029
Hualapai Tribe hyperscale data-center moratorium Other Moratorium Since Sep 2026 · no end date
Mesa, AZdata center PAD overlay requirement (Ordinance No. 5957) City / Town Zoning Overlay / Special Use Permit No end date
Pima County economic-development NDA and large-load due-diligence rules County / Parish Other Since Sep 2026 · no end date
Pima County, AZdraft four-month data center moratorium County / Parish Moratorium Since Sep 2026 · no end date
Tucson, AZlarge-scale data center UDC standards City / Town Zoning Overlay / Special Use Permit Since Sep 2026 · no end date

Projects in Arizona →

North Dakota 6

JurisdictionLevelWhat it doesWindow
Barnes County, ND6-mo data center moratorium County / Parish Moratorium May 2026 → Nov 2026
Dunn County, ND1-yr data center moratorium County / Parish Moratorium Mar 2026 → Mar 2027
Durbin Township, NDone-year moratorium Township / Village Moratorium Oct 2026 → Oct 2027
McKenzie County, NDdata center ordinance (CUP, setbacks) County / Parish Zoning Overlay / Special Use Permit Since Sep 2026 · no end date
Mercer County, ND1-yr data center moratorium County / Parish Moratorium Mar 2026 → Mar 2027
Morton County, NDdata center moratorium County / Parish Moratorium Since Sep 2024 · no end date

Projects in North Dakota →

Arkansas 4

JurisdictionLevelWhat it doesWindow
Carroll County, AR1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027
North Little Rock data-center campus conditional-use ordinance City / Town Zoning Overlay / Special Use Permit Since Sep 2026 · no end date
Russellville, AR6-mo data center moratorium City / Town Moratorium Jul 2026 → Jan 2027
Union County, AR1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027

Projects in Arkansas →

New Mexico 4

JurisdictionLevelWhat it doesWindow
Colfax County, NM1-year data center moratorium (unincorporated areas) County / Parish Moratorium Since Aug 2026 · no end date
Lea County, NMdata-center project requirements resolution County / Parish Siting / Noise / Water Restriction Since Feb 2026 · no end date
Santa Fe County, NM540-day data center moratorium County / Parish Moratorium Jun 2026 → Dec 2027
Socorro County, NM1-yr data center moratorium County / Parish Moratorium Jun 2026 → Jun 2027

Projects in New Mexico →

Connecticut 3

JurisdictionLevelWhat it doesWindow
Morris, CT1-yr data center moratorium City / Town Moratorium May 2026 → May 2027
New Haven, CTproposed data center moratorium City / Town Moratorium Since Sep 2026 · no end date
West Haven, CT1-yr data center moratorium City / Town Moratorium Jun 2026 → Jun 2027

Projects in Connecticut →

Montana 2

JurisdictionLevelWhat it doesWindow
Missoula City Unified Development Code data center definition amendment City / Town Zoning Overlay / Special Use Permit Since Nov 2026 · no end date
Missoula County, MT1-yr data center moratorium County / Parish Moratorium Jul 2026 → Jul 2027

Projects in Montana →

Delaware 1

JurisdictionLevelWhat it doesWindow
Dover Data Center Moratorium City / Town Moratorium Oct 2026 → Apr 2028

Projects in Delaware →

Idaho 1

JurisdictionLevelWhat it doesWindow
Blaine County emergency moratorium on data centers County / Parish Moratorium Since Oct 2026 · no end date

Projects in Idaho →

Louisiana 1

JurisdictionLevelWhat it doesWindow
New Orleans, LA1-yr data center moratorium City / Town Moratorium Jan 2026 → Jan 2027

Projects in Louisiana →

Mississippi 1

JurisdictionLevelWhat it doesWindow
Ridgeland, MSdata center setbacks and infrastructure adequacy test City / Town Zoning Overlay / Special Use Permit Since Apr 2026 · no end date

Projects in Mississippi →

South Dakota 1

JurisdictionLevelWhat it doesWindow
Yankton County, SD6-mo data center moratorium County / Parish Moratorium Jul 2026 → Jan 2027

Projects in South Dakota →